A major LCD manufacture‘s advanced manufacturing line project in NanJing
This high-performance gas treatment system has been contrapuntally designed, manufactured, installed for the owner. The installation and commissioning test has completed in January 2011. The system composed by 3 sets of the Double-stack FBS scrubbers. It has a high treatment performance for the high concentration Acid and Alkaline gas. The system total discharge capacity is 1500m3/min, It’s one of the greatest project that we’ve been completed in china till now.